HV & EHV transmission line and grid station contractor · Since 1991 +92-71-5806078info@mrcc.pkWhatsAppStaff login
Home/Projects

Proven on the Grid, Delivered in the Field.

Selected transmission lines, grid stations and civil works, including our most demanding projects.

Restored 500 KV tower with quad conductorsAfter · line restored
Collapsed 500 KV tower lying in a paddy fieldBefore · collapsed towers
500 KVEmergency rebuild

Restoration of Three Collapsed 500 KV Towers.

Dadu–Shikarpur line. Our teams cleared the damaged structures, rebuilt the foundations and towers, and re-strung the circuit to return it to service.

Voltage
500 KV
Towers
3 rebuilt
Energised
April 2024
Top view of a finished foundation next to the river
132 KV · Piling · River crossing

New Rohri–Sukkur crossing

Tower foundations on piles in the Indus river bed. Executed in joint venture with Zarif Khan & Brother, with MRCC as lead partner.

Rig, crane and crew working in waterlogged ground
Grid station · Piling

Grid Station Dokri on piles

Pile foundations for a complete grid station in soft, waterlogged ground.

Newly awarded

Next on Our Books

Awarded · Civil works

Residential colony and allied civil works, 220 KV Grid Station Dhabeji

Construction of a complete staff residential colony at NGC's 220 KV Grid Station Dhabeji, with roads, water supply, sewerage, electrification and landscaping.

Client
NGC
Location
Dhabeji, Sindh
Duration
550 days
Start
December 2026

Awarded to Usman and Company – MRCC (JV), a joint venture of M.R Construction Company and Usman and Company (Pvt) Limited.

Scope of work
  • RCC-framed residential buildings: foundations, structure and concrete block masonry
  • Roof waterproofing and thermal insulation to the NEECA Building Code 2023
  • Finishes: tiles, marble, plaster, paint, false ceilings, doors, aluminium windows and fitted cabinets
  • Plumbing, sanitary and water supply works with an RO water treatment plant
  • Sewerage and drainage network with manholes and pumps
  • Electrical wiring and fixtures, colony electrification and street lighting
  • Roads, kerb stones, tuff-paver paving and a car shed
  • Landscaping, lawns and a children's play area
  • Mosque fit-out, air-conditioning and furnishing
Track record

Complete Track Record

A documented record of works since 1993 for NTDC/NGC, WAPDA, power distribution companies and main contractors.

YearProjectVoltageClientStatus
2026
Residential colony and allied civil works, 220 KV Grid Station DhabejiCivil works · Dhabeji, Sindh
220 KV NGC · JV with Usman & Co Awarded
2026
132 KV SDT Shahdad Kot–Garhi Khero line, locations 100–120 (5.2 km)Ongoing · Shahdad Kot – Garhi Khero, Sindh
132 KV SEPCO Sukkur Ongoing
Oct 2026
132 KV double-circuit feeding line for Technopolis Grid Station (1.169 km), steel tubular polesTransmission line · Islamabad
132 KV IESCO Completed
2026
132 KV Dadu–K.N. Shah re-routing at Cadet College Kakar (deposit work)Transmission line · Kakar, Dadu, Sindh
132 KV SEPCO Completed
2026
Dismantling and shifting of four 500 KV single-circuit towers at Sekhat (Engro back-feed interconnection)Restoration · Sekhat, Tharparkar, Sindh
500 KV NGC EHV-II Hyderabad Completed
Oct 2025
500 KV Dadu–Shikarpur Circuit-II, Tower 109 emergency rebuildRestoration · Dadu–Shikarpur line, Sindh
500 KV NGC Completed & energised
2025
132 KV SDT Sakrand–Nawabshah, locations 46–61Transmission line · Sakrand – Nawabshah, Sindh
132 KV HESCO Completed
2025–26
132 KV Naseerabad–Dokri line, locations 1–22 (5.772 km), bored pile foundationsTransmission line · Naseerabad – Dokri, Sindh
132 KV SEPCO Completed
Apr 2024
500 KV Dadu–Shikarpur Circuit-II, three collapsed towers rebuilt, locations 37–39Restoration · Dadu–Shikarpur line, Sindh
500 KV NTDC · EHV-II Hyderabad Completed & energised
2023–24
132 KV New Rohri–Sukkur Site river crossing, locations 42–57 (about 2.9 km)Transmission line · New Rohri – Sukkur, across the Indus
132 KV SEPCO · JV, MRCC lead partner Completed
Jun 2023
132 KV double-circuit Jhimpir-II–Indus WPP & Liberty-II–Din WPP, four towers restored after Cyclone BiparjoyRestoration · Jhimpir wind corridor, Thatta
132 KV NTDC · EHV-II Completed & energised
2023
Grid Station Dokri, 66 to 132 KV conversion on special pile foundationsGrid station · Dokri, Larkana
132 KV SEPCO Completed
2023
Control house on special pile foundations, 132 KV Grid Station DokriCivil works · Dokri, Larkana
132 KV SEPCO Completed
2023
Tuff paver road at 220 KV Grid Station VehariCivil works · Vehari, Punjab
220 KV NTDC Completed
2020
Staff flats (Cat-IV, D-type) at 132 KV Grid Station Sakhi Wahab Hussain ValleyCivil works · Hyderabad, Sindh
132 KV HESCO Completed
2019–22
220 KV Uch–Sibi line, SDT twin bundle (about 110 km)Transmission line · Uch Power – Sibi, Balochistan
220 KV SDEPCI for NTDC Completed
2018
220 KV double-circuit line from RLNG Power Plant Trimmu to 220 KV Grid Station Toba Tek Singh (about 50 km)Transmission line · Trimmu – Toba Tek Singh, Punjab
220 KV NTDC · JV with Usman & Co Completed
2018
Four 132 KV line bays at Humayoun and RatoderoGrid station · Humayoun and Ratodero, Sindh
132 KV SEPCO Completed
2016–17
500 KV double-circuit quad-bundle lines, Port Qasim–Hub / Jamshoro (sub-contract)Transmission line · Port Qasim – Hub / Jamshoro
500 KV ICC · MREC Completed
2016–17
500 KV double-circuit quad-bundle line, 95–145 km near Domeli (sub-contract)Transmission line · Near Domeli, Jhelum, Punjab
500 KV ICC · MREC Completed
2010
132 KV double-circuit feed for Shah Ladhani: friction-type bored pile foundationsTransmission line · Shah Ladhani, Sindh
132 KV HESCO Completed
2010
132 KV SDT Badin–Golarchi: tower foundationsTransmission line · Badin – Golarchi, Sindh
132 KV HESCO Completed
2010
66 KV in and out feed for Kunri: tower foundationsTransmission line · Kunri, Umerkot
66 KV HESCO Completed
2010–12
132 KV Tando Allahyar–Chamber, 27 km (World Bank): survey to commissioningTransmission line · Tando Allahyar – Chamber, Sindh
132 KV HESCO Completed
2009
132 KV double-circuit Dadu–Qazi Ahmed–Sakrand river crossing: towers rebuilt and restrungRestoration · Dadu – Qazi Ahmed – Sakrand, across the Indus
132 KV HESCO Completed
2009
132 KV double-circuit TPS Naudero–Ratodero: foundations, erection, stringingTransmission line · Naudero – Ratodero, Larkana
132 KV HESCO Completed
2009
132 KV double-circuit Nokhar–College Road, Gujranwala: erection to commissioningTransmission line · Gujranwala, Punjab
132 KV GEPCO Completed
2009
132 KV feed for Mehrabpur: erection of 220 KV-type towersTransmission line · Mehrabpur, Naushahro Feroze
132 KV HESCO Completed
2009
132 KV T.M. Khan–Bulri Shah Karim: line rehabilitationRestoration · Tando Muhammad Khan – Bulri Shah Karim, Sindh
132 KV HESCO Completed
2009
132 KV double-circuit Dadu–Moro and Dadu–Qazi Ahmed: welding and anti-rust worksTransmission line · Dadu – Moro / Qazi Ahmed, Sindh
132 KV HESCO Completed
2009–10
132 KV Grid Station Ghangra Mori: staff quarters, water supply, sewerage, roadCivil works · Ghangra Mori, Sindh
132 KV HESCO Completed
2009–10
132 KV Grid Station Vehari and Harappa: sewerage works and switchyard gravelCivil works · Vehari and Harappa, Punjab
132 KV MEPCO Completed
2009–10
132 KV Grid Station Shah Ladhani: culverts and bridgeCivil works · Shah Ladhani, Sindh
132 KV HESCO Completed
2008
132 KV SDT Mirpurkhas–Samaro: foundations and stringingTransmission line · Mirpurkhas – Samaro, Sindh
132 KV HESCO Completed
2008–10
132 KV SDT Samaro–Umerkot: foundations, stringing and weldingTransmission line · Samaro – Umerkot, Sindh
132 KV HESCO Completed
2007–08
Sixteen metering rooms at grid stations and power housesCivil works · Several sites
— NTDC Completed
2006–07
132 KV Hala Road–Jamshoro Indus river crossing: chimney re-concreting, three towers, stringingTransmission line · Hyderabad – Jamshoro, across the Indus
132 KV HESCO · JV Completed
2006–07
132 KV K.N. Shah–Rehmani Nagar river crossing: foundations and stringingTransmission line · K.N. Shah – Rehmani Nagar, Sindh
132 KV NTDC / HESCO Completed
2006–07
132 KV SDT Nawabshah–Daur: foundations and weldingTransmission line · Nawabshah – Daur, Sindh
132 KV HESCO · JV Completed
2006–07
132 KV Shikarpur–Humayoun: welding and stringingTransmission line · Shikarpur – Humayoun, Sindh
132 KV HESCO Completed
2006–07
Emergency breakdown works on five 132 KV lines in upper and central SindhRestoration · Upper and central Sindh
132 KV HESCO Completed
2003–04
132 KV single-circuit Thull–Hairdin: erection, stringing, emergency foundation repairTransmission line · Thull – Hairdin
132 KV NTDC Completed
2003–04
66 KV in and out feed for Gandakha: foundations and weldingTransmission line · Gandakha, Jhal Magsi, Balochistan
66 KV NTDC Completed
2003–04
132 KV Sanghar–Mirpurkhas: welding on 220 towersTransmission line · Sanghar – Mirpurkhas, Sindh
132 KV NTDC Completed
2003–04
132 KV Shikarpur–Dokri–Ratodero: emergency tower foundationsRestoration · Shikarpur – Dokri – Ratodero, Sindh
132 KV NTDC / HESCO Completed
2003–04
PLC equipment foundations at 132 KV grid stations; breaker foundations at Grid Station RatoderoGrid station · Ratodero and other grid stations, Sindh
132 KV NTDC Completed
2001
132 KV Kandhkot–Shikarpur: nut-bolt welding and anti-rust paintingTransmission line · Kandhkot – Shikarpur, Sindh
132 KV WAPDA Completed
1999–2000
132 KV double-circuit Industrial-II–Mariabad, Quetta: survey to commissioningTransmission line · Quetta, Balochistan
132 KV NTDC · JV Completed
1999–2000
132 KV double-circuit Qilla Abdullah–Chaman: erection and stringingTransmission line · Qilla Abdullah – Chaman, Balochistan
132 KV NTDC · JV Completed
2000
132 KV Grid Station Naseerabad: control house, fencing, equipment foundations, trenchesGrid station · Naseerabad, Balochistan
132 KV NTDC Completed
1998
132 KV Guddu–Kashmore–Kandhkot: tower foundationsTransmission line · Guddu – Kashmore – Kandhkot, Sindh
132 KV WAPDA Completed
1993
Carriage of tower material, Sukkur to Dera Murad Jamali and Kashmore yardsTransmission line · Sukkur – Dera Murad Jamali / Kashmore
— WAPDA Completed
Earlier
132 KV Liberty–Daharki–Guddu river crossingTransmission line · Daharki – Guddu, across the Indus
132 KV SEPCO Completed
Earlier
10/13 MVA transformer bays at New Jatoi, Mehar, Padidan and RadhanGrid station · Central Sindh (four grid stations)
132 KV SEPCO Completed
From site

Photos and Video

See all photos
MRCC crew in safety gear on the 220 KV Uch–Sibi line220 KV Uch–Sibi
Rebuilt tower standing with the crane alongside500 KV rebuild
Restored 132 KV tower at Jhimpir with crew on the crossarms132 KV Jhimpir-II
Survey set up on the new alignmentRoute survey
Slurry pit reflecting the blue piling rigGrid Station Dokri

Planning a Transmission Line or Grid Station Project?

Request a quote
M.R Construction+92-71-5806078 · info@mrcc.pk · Sukkur · Lahore© 2026 M.R Construction Company